$projecthp
  • How do I change the order of posts in a thread?
  • How do I change the order of posts in a thread?
  • How do I change the order of posts in a thread?
  • How do I change the order of posts in a thread?

Thanks Thanks:  0
Likes Likes:  0
Dislikes Dislikes:  0
Results 1 to 3 of 3
  1. #1
    Member
    Join Date
    Apr 2009
    Location
    Washington
    Posts
    25
    Corvette(s)
    1990 ZR-1
    Post Thanks / Like
    Rides
    0

    Default How do I change the order of posts in a thread?

    I see this under FAQ but there is no (Newest First) of Linear Mode. What am I missing?
    --------------------------
    When viewing a thread, you will be able to view the thread from a choice of four modes.


    1. Linear Mode (Oldest First) - In this mode, posts are displayed chronologically from oldest to newest. Posts are shown in a flat mode so that many posts can be viewed simultaneously.
    2. Linear Mode (Newest First) - This is the same as the above mode, except that posts are ordered in an opposite way (newest first).
    3. Threaded Mode - In this mode, a tree is shown along with every post. This tree allows you to see the relationship each post has to others, in terms of who responded to whom. Only one post is shown at a time.
    4. Hybrid Mode - This mode is a mixture of the linear and threaded modes. The post tree is displayed like in the threaded mode, but multiple posts are displayed simultaneously like in the linear modes.

  2. #2
    Administrator Yoda's Avatar
    Join Date
    Oct 2000
    Location
    Amarillo, TX
    Posts
    4,889
    Corvette(s)
    1981 UL5
    Post Thanks / Like
    Rides
    0

    Default

    Scott,

    I just tried the Linear Mode .. show Latest post first... worked for me ..

    You need to go to the top of the page.... CLICK on SETTINGS
    Left side.... CLICK on GENERAL SETTINGS
    Under THREAD DISPLAY OPTIONS use Drop Down Menu for THREAD DISPLAY MODE.
    CLICK ON.... OPTION DESIRED..
    Arrow to bottom of page and CLICK... SAVE CHANGES

    You should be good to go

    Bud
    "Quality, not quantity"
    "The American people will never knowingly adopt "SOCIALISM." But, under the name of "LIBERALISM," they will adopt every fragment of the "SOCIALIST" program, until one day America will be a "SOCIALIST NATION," without knowing how it happened.
    (Norman Thomas, U.S. SOCIALIST PARTY CANDIDATE PARTY presidential candidate 1940, 1944 and 1948)


  3. #3
    Member
    Join Date
    Apr 2009
    Location
    Washington
    Posts
    25
    Corvette(s)
    1990 ZR-1
    Post Thanks / Like
    Rides
    0

    Default

    Thanks a bunch Bud
    It's a sad fact that I use another forum based on this same engine
    and changed it years ago but forgot how.
    I was trying to use the button on the right that says "Display".
    It shows only "Linear Mode" and "Threaded Mode" but no other.
    All is well now.
    Scott

Similar Threads

  1. need info on Pre-purchanse order Did you buy your 1984 NEW or Pre-order it?
    By VIN_#_00521__Z-51_C4 in forum C4 General Discussion
    Replies: 3
    Last Post: 06-11-10, 07:40 AM
  2. Last Chance to Change My Order!!!!
    By CWSWine in forum C6 General Discussion
    Replies: 6
    Last Post: 01-06-08, 08:29 PM
  3. Why So Few C6 Posts Lately?
    By kgelliott in forum C6 General Discussion
    Replies: 23
    Last Post: 08-19-07, 08:04 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •